When the number is not in the catalog
Sooner or later a machine arrives with a part that no catalog lists, because it was built in a short run, modified in the field or discontinued years ago. The buyer still needs it. What changes is the route: search old stock, copy an existing part, or tool a new production run.
Each route has a different cost structure and a different risk. Searching costs time. Copying costs a sample and a measurement report. Tooling costs money before anything is made, which is why it is the route that most often goes wrong in a quotation that named a unit price and never named who pays for the tool.
Three ways to pay for a tool
Upfront is the cleanest: the buyer pays tooling as a separate line, owns the tool and buys parts at a price that excludes it. Amortized is easier on cash and harder to audit, because the tooling sits inside the unit price and the buyer cannot see when it has been recovered.
The third route is a hybrid, common where volumes are uncertain: a smaller upfront payment plus a per-unit contribution that stops after an agreed quantity. Most programs run by Guangzhou Shenyue Machinery Technology Co., Ltd. use one of these three and state the amortization quantity, the price after it is reached and what happens if the order stops halfway.
First-article approval before the run
Nothing should be produced in quantity before one sample has been measured and accepted. The approval pack is short: a dimensional report against the drawing, the material certificate, a hardness or finish result where it matters, and photographs of the part offered up to the machine if fit is in question.
Approval should be in writing and should reference the drawing revision, because a part approved in March and produced in June from a revised drawing is a different part. The first article travels with its report and the balance of the order waits for a written release.
Terms that protect both sides
Four clauses carry the relationship. Ownership: who holds the tool if the program ends, and who pays for its transfer. Exclusivity: whether the tool may be used for anyone else, and for how long. Price: the unit price at each quantity band, written down rather than agreed on a call.
The fourth is change control. A drawing revision, a material substitution or a tolerance change has a cost, and it should be quoted before it is applied rather than discovered on the invoice. A specials program without change control turns every small modification into a negotiation, which is why Guangzhou Shenyue Machinery Technology Co., Ltd. prices the change before applying it.
How specials are handled here
Guangzhou Shenyue Machinery Technology Co., Ltd. quotes specials as a separate document from the catalog price file, with tooling, first article, quantity bands and lead time on one page. Catalog coverage runs to 3,000+ part types on the shelf and 100,000+ part numbers available to order; anything outside that is quoted as a project with its own terms.
We are an independent supplier, authorized for four brands — Mitsubishi Heavy Industries, Garrett, TONGMYUNG and Marusan — and supplying other machine brands as genuine parts through original channels or as OEM-quality and aftermarket equivalents. For Kobelco and other machine brands we are not an authorized dealer. A special is quoted with the grade the tool will produce, because a tool that makes the wrong grade is expensive twice.
Three routes for a part that is not in the catalog
| Route | What it costs and what it risks |
|---|---|
| Old stock search | Time only, no tooling; success depends on how the number was superseded. |
| Copy an existing part | A sample and a measurement report; castings may still need a tool. |
| Tool a new run | Tooling upfront or amortized, a minimum quantity and a first-article release. |
| Repair or rework | Cheapest where the original can be reworked; depends on core condition. |
Frequently asked
Who owns the tooling after a special run?
Whoever the quotation says. If the buyer paid for the tool upfront, the tool should be the buyer's and should be transferable, which is worth writing into the order rather than assuming. If the tooling was amortized, the supplier usually keeps it, and that is a fair trade for a lower entry price.
What is a reasonable minimum quantity for a special?
Whatever the tool and the setup can absorb without loading the unit price beyond the genuine alternative. Below that point the special costs more than the problem it solves, and the honest answer is to repair the original part or keep searching.
Can a special be quoted without a sample?
Only if a drawing exists and is current. Without either, the supplier is guessing at dimensions, and a guess that is two tenths out produces a part that fits nothing. Send the failed part with its wear pattern; the wear is information as well.
Send the machine model, serial number, the part numbers you have and the quantity. That is all we need to quote and confirm fitment before payment.