Get a Quote

Home / Blog / Responding to a fleet parts tender without pricing yourself out

Responding to a fleet parts tender without pricing yourself out

A tender is a scored document, not a price request. Suppliers who lose usually lose on the schedule they left blank, not on the number at the bottom.

Read the scoring before you read the schedule

Public and corporate fleet tenders publish their evaluation criteria, and the weights tell you what the buyer actually cares about. Price commonly carries forty to sixty percent of the score, which means it decides close bids and nothing else. Availability, lead time, warranty and past performance make up the rest, and a bid that is eight percent high with a documented fill rate and a working emergency line can beat a cheaper one that offers neither.

The mistake is to price first and read the criteria afterwards. Two hours spent on the scoring model changes which lines you compete on, which lines you quote as an alternative, and which lines you decline rather than quote badly.

Build a compliance matrix before a price

Every line of the buyer's schedule needs a cell filled in: your part number, the grade offered, any alternative offered, the lead time, and whether the item is stocked or sourced. Where the specification names a brand, say whether you are offering that brand or an equivalent, and define what equivalent means in that row. Blank cells are read as non-compliance, not as a gap to be discussed at interview.

The matrix also protects you commercially. Once grade is a column, an evaluator comparing your total against a lower total can see whether the difference is price or specification. Without that column, the comparison is between two numbers that describe different products, and the cheaper number always looks better in a committee room.

Pricing a schedule of several hundred lines

Tenders usually ask for firm prices across a long list for twelve months, which is a currency and cost position, not just a price. Three things make it survivable. Quote a validity period you can honor rather than the one requested, and say why. Group the schedule into bands, so that fast-moving consumables, hydraulic assemblies and electronic items are not forced into one margin. And separate the genuinely volatile lines, anything with copper or electronics content, into their own schedule with an indexation clause.

Pricing the basket as a whole is the other half. A total built from keen prices on the high-volume lines and generous margins on the rare ones is what an auditor finds in year two, and it damages the relationship far more than a slightly higher total would have. It is also worth being honest about availability: a supplier holding 3,000+ part types on the shelf cannot promise next-day delivery on nine hundred lines, and a tender response that distinguishes ex-stock from available-to-order, with days quoted per line, scores better than a promise that collapses in month three.

The paperwork that disqualifies bids

Bids are lost on formalities more often than on price. A page that was not signed, a validity period shorter than required, a submission in the wrong format or after the deadline, a required sample that never arrived, a bid bond in the wrong amount. None of these are arguments a buyer can waive, and most of them are checked before the price is even opened.

Guangzhou Shenyue Machinery Technology Co., Ltd. supports distributors and fleet suppliers preparing this kind of submission, with documented grades, lead times and 100,000+ part numbers available to order behind the shelf stock. We are an independent supplier, formally authorized for five brands: Garrett, Mitsubishi Heavy Industries, TONGMYUNG, NIKURA and Marusan, and for Kobelco and other machine brands we are not an authorized dealer, which is stated in writing on every quotation so that it can be attached to a tender without editing.

Guangzhou Shenyue Machinery Technology Co., Ltd. has supplied excavator parts from Guangzhou since 2007. A tender pack from us normally carries the grade schedule, the availability statement and the authorization list as three separate documents, because that is the shape an evaluator scores.

What an evaluator scores

CriterionWhat earns the points
PriceTotal schedule value, and consistency across the bands. Usually 40-60 percent.
AvailabilityStock on the fast movers, with a number rather than an adjective.
Lead timeDays quoted per line, split between ex-stock and to-order.
Grade and specificationComplete matrix with alternatives defined, not left blank.
Warranty and claimsA written policy with a response time, not a promise of support.
ComplianceSigned, formatted, on time. Pass or fail, and fail ends the bid.

Frequently asked

Should I bid on every line in the schedule?

No, and offering to do so is usually the weaker bid. Quote competitively on the lines where you have stock or a genuine cost advantage, quote honestly on the rest with the lead time you can hold, and where a line is outside your range say so in the matrix. Evaluators penalize a promise that is visibly unsupported more than a gap that is explained.

Can I offer an equivalent instead of the named brand?

Often yes, but only in the way the tender allows. Most schedules have a column for alternatives, and the ones that do not usually permit a deviation sheet. An unnamed substitution buried in a price cell is treated as non-compliance, and on public tenders it can be challenged by a competing bidder.

Is a firm price for twelve months realistic?

It is realistic if the validity window, the currency and the indexation are all negotiated before signature. What is not realistic is holding a firm price through a currency move and a supplier increase without either a clause or a margin cushion, which is why suppliers who accept the request as written tend to disappear halfway through the contract.

Get a price on this line

Send the machine model, serial number, the part numbers you have and the quantity. That is all we need to quote and confirm fitment before payment.

Request a quote