Get a Quote

Home / Blog / How long a parts quotation should hold, and what to do when it expires

How long a parts quotation should hold, and what to do when it expires

Every quotation carries a date after which it is a historical document. Most buyers ignore it until the day it matters, which is usually the day the purchase order is ready.

Four things move under a quoted price

A parts price is not one number. It is a bundle of four, and each moves on a different clock. The supplier's own cost moves with raw material, factory scheduling and the exchange rate the factory prices in. The freight rate moves weekly and can move violently on heavy cargo. The currency of the quotation moves daily if the quote is in the buyer's currency but the cost is in another. And the stock position moves whenever somebody else orders the same line.

A validity date is a statement about all four. When a quotation says thirty days, it is saying the supplier will absorb movement in those four variables for thirty days. When it says ninety, somebody has made an assumption.

Why the window differs by product

On commodity lines held on the shelf, a thirty-day hold costs the supplier very little, because the cost base is stable and the stock is already paid for. On a large assembly sourced to order, a thirty-day hold is a real position: the factory price may already have moved, and the supplier is carrying the difference.

On heavy cargo the freight component can dominate, and that is where the shortest validities belong. A track group quotation that ignores a freight increase of twenty percent is not a quotation, it is an offer to lose money. Buyers who understand this stop treating a short validity on heavy parts as an evasive answer.

The useful habit is to look at which component is largest and match your planning to it. On light parts, plan around stock. On heavy parts, plan around the vessel.

What a price hold should actually say

A well-written hold names four things: the period, the grade and specification it applies to, the quantity band, and what happens at the end of the period. A hold without a quantity band is not a hold, because the price for five units and the price for five hundred are different conversations.

For repeat buyers, an index-linked arrangement is often better than a long fixed price. The price is tied to a published index or to the supplier's documented cost, with a floor and a cap and a review date.

What neither side should accept is silence. A quotation with no validity date invites the buyer to assume forever and the supplier to assume nothing, and the argument that follows is about a contract neither of them wrote.

Handling an expired quote without a fight

The first step is to ask what changed rather than what the new price is. A revised quote that itemizes the movement — material, freight, currency, stock — is a working document. One that simply states a higher number is a negotiating position, and it is worth saying so politely.

The second step is to separate the price from the terms. If the price moved because freight moved, a change of terms can recover part of it: a different port, a consolidated sailing, a slower service. If it moved because the line is no longer at the old cost, no amount of term-shuffling will fix it.

The third step, for orders that are genuinely close, is a deposit. A partial payment against a fixed price for a defined period is the cleanest way to convert a quotation into a commitment, and it is normal practice on large assemblies. It costs less than re-quoting into a rising market, and it gives the supplier a reason to hold stock.

Finally, put the outcome in the purchase order. The validity date, the grade, the quantity and the delivery basis all belong on the order document, not in an email thread. Guangzhou Shenyue Machinery Technology Co., Ltd. writes all four into the order confirmation, because that single habit prevents most disputes that look like pricing arguments and are really record-keeping failures.

How quotations are issued here

Guangzhou Shenyue Machinery Technology Co., Ltd. has quoted excavator parts from Guangzhou since 2007, with 3,000+ part types on the shelf and 100,000+ part numbers available to order. Each quotation states its validity, the grade of every line, and whether the line ships from the shelf or is sourced to order.

We are an independent supplier, authorized for five brands — Garrett, Mitsubishi Heavy Industries, TONGMYUNG, NIKURA and Marusan — and supplying other machine brands as genuine parts through original channels or as OEM-quality and aftermarket equivalents. For Kobelco and other machine brands we are not an authorized dealer. Where a buyer needs a longer hold than the standard window, the honest answer is a deposit against a fixed price rather than an open-ended promise.

Matching validity to the order

Order typeSensible validity
Shelf commodity lines, light parts30 days. Cost base is stable and the stock is already held.
Mixed order, shelf plus sourced lines15 to 30 days, with the sourced lines flagged individually.
Heavy undercarriage and attachments7 to 15 days. Freight is the largest variable and it moves fast.
Repeat contract with a fixed flow90 days with an index clause, a floor and a cap.
Large assembly sourced to order14 days, or longer against a deposit.

Frequently asked

Is a short validity a warning sign?

Not by itself. On heavy parts and on assemblies sourced to order, a short validity is the accurate answer, because freight and factory pricing genuinely move within weeks. A short validity on a shelf commodity line is a different matter and usually means the supplier is not holding the stock they are quoting.

Can a supplier legally refuse to honor an expired quote?

A quotation is normally an invitation to treat rather than a binding offer, which is why the validity date matters. Once a purchase order is accepted on stated terms, the position changes. This is worth confirming with your own counsel, but the practical lesson is the same: the date on the quote is part of the deal.

What is the fairest way to handle a price increase on a repeat order?

Itemize it and give notice. A buyer who sees material, freight and currency broken out can judge whether the increase is real and can adjust their own selling price in time. A single new number with no explanation forces a re-tender.

Get a price on this line

Send the machine model, serial number, the part numbers you have and the quantity. That is all we need to quote and confirm fitment before payment.

Request a quote