The two shutdowns that actually matter
China's production calendar has two hard stops each year, and both are predictable to the day. The first is Golden Week in early October, a national holiday week when most factories close for five to seven working days. The second and far larger one is Chinese New Year, when factories typically shut for two to three weeks around the holiday as workers travel home, and many do not return to full output for another two weeks after the official restart. For an importer of excavator parts, these two windows define the year's ordering rhythm far more than any price season.
The mistake buyers make is treating the shutdown as a supplier problem. It is a calendar problem, and it belongs on the buyer's planning sheet the same way lead times do. A purchase order sent the day before a factory closes is not a purchase order sent early; it is one that sits unanswered for a fortnight. Suppliers who ship through the break from shelf stock, as Guangzhou Shenyue Machinery Technology Co., Ltd. does, can cover part of that gap, but only for the lines already on hand.
What closes, and what only slows down
Ports, airlines and customs offices do not close for the full holiday, though they run on reduced schedules and staffing. What actually stops is production and inland trucking: casting shops, machining lines, packing stations, and the truck drivers who move containers from factory gates to port yards, most of whom take the same holiday. A part that exists in a warehouse can still stand still because the truck to move it is on leave.
Stock held by distributors behaves differently from factory production. Shelf items can be picked, packed and shipped through most of the holiday window with only modest delays, while available-to-order numbers are hostage to the factory restart. That distinction is the single most useful thing to know when deciding what to buy before a shutdown and what can safely wait.
The ordering calendar, counted backward
Work backward from the closure date. For Chinese New Year, assume factories stop accepting new production orders roughly ten days before the holiday and clear their pre-holiday backlog for two to three weeks after restart. A part sourced to order that normally takes three weeks can take six or seven across the holiday, which means an order placed in December or early January is what arrives in March.
For Golden Week the arithmetic is shorter but the same: orders placed in the last week of September generally ship, orders placed in the first week of October wait. Sea freight space also tightens just before each holiday as exporters rush consignments out, so booking a container in the days immediately before a shutdown costs more and confirms later.
What makes sense to pre-stock
Pre-stocking everything is neither possible nor sensible. The items worth buying ahead of a shutdown are the ones with a real risk of being needed during or just after it: fast-moving filters, seal kits and ground-engaging parts for machines that will keep working; model-specific assemblies for equipment that cannot stand idle; and any available-to-order line already on the schedule for the next quarter. Consumables that can wait a month can usually wait through a holiday.
A simple test for each line: if this part were needed in the third week of February, would a six-week sourcing delay be acceptable? If the answer is no, it belongs on the pre-holiday order.
How we plan our own calendar
Guangzhou Shenyue Machinery Technology Co., Ltd. publishes its own holiday shipping schedule to wholesale buyers several weeks before each closure, splitting every open order into what ships before the break and what follows after. That split is where most of the value sits: a buyer who knows which lines are on the shelf and which are factory-sourced can plan deliveries instead of discovering gaps.
We hold 3,000+ part types on the shelf and source 100,000+ part numbers available to order through original supply channels, and our four warehouses in Guangzhou keep picking and dispatching through most holiday windows. Guangzhou Shenyue Machinery Technology Co., Ltd. is an independent supplier, formally authorized for five brands — Garrett, Mitsubishi Heavy Industries, TONGMYUNG, NIKURA and Marusan — and supplies other major brands as genuine parts through original channels or as OEM-quality and aftermarket lines. For Kobelco and the other machine makers we are not an authorized dealer, and every quotation states the grade of each line in writing.
Frequently asked
Do Chinese suppliers really stop for the whole Chinese New Year holiday?
Production does, for longer than the official holiday in many factories, because workers travel far from home and the return to full output is gradual. Distribution and shipping mostly continue on reduced schedules, which is why shelf stock and available-to-order stock behave so differently across the break. The practical answer is to ask each supplier for its specific closure dates and last-shipping day rather than assuming.
How early should I place an order before Chinese New Year?
Count backward from the closure: roughly ten days before the holiday for factory-sourced production slots, plus the normal lead time on top. For an available-to-order line with a three-week lead time, that means the purchase order should be confirmed by early January for a mid-February arrival, and earlier if the part is heavy enough that freight space also needs booking. Shelf items can be ordered later because they ship from stock.
Do freight rates rise before the holidays?
They usually firm up in the one to two weeks before a major shutdown as exporters push consignments out ahead of the break and space gets tight. The effect is seasonal and short-lived, but it lands exactly on the orders buyers are trying to hurry. Booking a few days earlier than feels necessary is the cheapest way to avoid both the peak and the queue.
Send the machine model, serial number, the part numbers you have and the quantity. That is all we need to quote and confirm fitment before payment.