A freight quote is a bundle, not a price
The number at the bottom of a forwarder's email is a sum of six or seven separate charges, some of which are fixed by the carrier, some by the port, some by the forwarder's own paperwork, and some by the month. When a buyer compares only the total, they are comparing two different bundles and drawing a conclusion about efficiency that the data does not support.
The fastest way to make quotes comparable is to ask each forwarder for the same breakdown, in the same order, with the same Incoterm attached. A quote that arrives as one line is not a quote, it is an offer to negotiate later.
The charges that decide comparability
Origin charges cover pickup, export customs declaration, terminal handling at origin, and documentation. Ocean freight is the carrier's rate for the space. Surcharges sit on top: bunker adjustment, currency adjustment, peak season, low-sulfur fuel. Destination charges cover terminal handling at arrival, release fees, and often delivery to door. Duty and tax are separate again and depend on the Incoterm, not on the forwarder.
The common failure is a quote that shows ocean freight and origin charges but quietly omits destination handling. It looks twenty percent cheaper and it is not cheaper at all. On a heavy consignment the destination side can be the larger half of the bill.
Chargeable weight and the volume rule
Less-than-container-load cargo is billed on whichever is greater, weight or volume, at a conversion ratio set by the carrier, commonly one cubic meter to one thousand kilograms. Undercarriage parts are dense, so they bill on weight. Filters, hoses and cab trim are bulky and light, so they bill on volume even though the scale says otherwise.
This is why packing decisions change freight cost more than negotiation does on mixed orders. A pallet stack rebuilt to remove air can move a shipment from volume-based to weight-based billing. That is a conversation worth having with your supplier before the goods are strapped down, not after. Guangzhou Shenyue Machinery Technology Co., Ltd. asks for carton dimensions with the order for that reason, not as paperwork.
Benchmarking without a spreadsheet habit
Three numbers are enough to keep a lane honest. Cost per twenty-foot container on the lane you use most, cost per cubic meter for consolidated cargo, and cost per kilogram for air. Record them every shipment, and after six shipments you have a baseline that tells you instantly whether a new quote is normal or an outlier.
The benchmark should be built from all-in numbers, delivered to your door, on the same Incoterm. A per-container rate that excludes destination charges will always look good and will always mislead. Guangzhou Shenyue Machinery Technology Co., Ltd. keeps that baseline on its regular lanes, so a quotation can be checked against the last six shipments rather than against memory.
What a usable quote contains before you accept it
A validity date, because surcharges move monthly and a rate without an expiry is a rate that will be renegotiated after you have committed. The Incoterm, stated explicitly. The chargeable basis, weight or volume. The transit time, port to port and door to door separately. And a named contact who will answer when the container is held.
Guangzhou Shenyue Machinery Technology Co., Ltd. quotes FOB and delivered terms on request and states which charges are included, because a delivered price that hides the destination side is the single most common source of invoice disputes on parts shipments.
We are an independent supplier, formally authorized for five brands — Garrett, Mitsubishi Heavy Industries, TONGMYUNG, NIKURA and Marusan — and supplying other major brands through original channels or as OEM-quality and aftermarket lines. Freight is quoted separately from the goods so the goods can be compared on their own merits.
What each charge is, and who bills it
| Charge | Billed by |
|---|---|
| Origin handling and export declaration | Forwarder at origin. Usually inside an FOB price. |
| Ocean or air freight | Carrier. The most visible line and rarely the largest on heavy cargo. |
| Bunker and currency surcharges | Carrier, adjusted monthly. Ask for the current month's level in writing. |
| Destination terminal handling | Port or agent at arrival. Frequently omitted from a cheap-looking quote. |
| Customs clearance and duty | Broker and customs. Determined by the Incoterm, not by the forwarder. |
| Detention and demurrage | Carrier. Accrues when containers or cargo sit beyond free time. |
Frequently asked
Why is a per-container rate cheaper than my LCL quote per cubic meter?
Because they are not the same product. A container rate buys the whole box whether you fill it or not, so the per-unit cost falls as you load more. LCL buys a slice of someone else's box and pays for handling at both ends. Below roughly half a container, LCL usually wins; above it, the container does, and the crossover point is worth calculating once for your common lanes.
Should I accept the cheapest quote on a lane?
Only after the bundles have been made identical. On identical terms, the cheapest quote is a legitimate answer, but check the transit time and the free time at destination first. A rate that saves two hundred dollars and costs four days of detention is not cheaper.
Who pays freight on an FOB shipment?
The buyer, from the moment the goods are loaded on board at the origin port. That includes ocean freight, insurance if the buyer arranges it, and all destination charges. On a delivered term the seller carries those costs and prices them into the goods, which is why the two numbers should never be compared directly.
Send the machine model, serial number, the part numbers you have and the quantity. That is all we need to quote and confirm fitment before payment.
Request a quote