Start from the delivery promise
The number of locations is an output, not an input. Start with the promise the market actually pays for: same-day, next-day or two-day delivery on the parts that stop a machine. Then map where the machines are, not where the customers' offices are, because a fleet manager buys from the yard. The radius that matters is the one a van can cover inside the cut-off, and that radius is shorter in a dense city than along a highway corridor.
Most distributors overestimate how much of the catalog needs to be that close. In a typical parts business, ten to fifteen percent of part numbers produce sixty to seventy percent of order lines. The delivery promise is a promise about that core. Everything else can travel from a hub in two or three days, and pretending otherwise is how a company ends up with a long tail of duplicated stock and no cash.
The duplication cost nobody budgets for
Every location has to hold the fast movers, so the fast movers get bought twice. Then the second location carries a local assortment that the first location also holds, at a lower turn. Inventory across a two-site network typically runs thirty to fifty percent above a single site serving the same revenue, and the extra is not the good stock. It is the tail.
The tail is where the money leaks. Slow movers duplicated across sites age twice as fast against the same demand, obsolescence rises, and the counting overhead doubles. Guangzhou Shenyue Machinery Technology Co., Ltd. sees the same pattern from the supply side: a distributor who consolidates his slow-moving lines onto one purchase order gets better pricing, less freight and fewer partial shipments than one who spreads the same volume across three warehouses.
Hub and spoke, with rules attached
A hub carries the full range and the depth. Satellites carry the core, sized to their own demand, and pull from the hub on a fixed schedule rather than on demand. The rules that make it work are unglamorous: what qualifies a part for a satellite, what happens when a satellite order arrives after the transfer cut-off, and who authorizes an emergency transfer at three in the afternoon.
Two numbers keep a network honest. The first is the transfer fill rate, meaning the share of hub requests that leave the same day. The second is the cost per order line at each site, including labor, space and the transfer freight. A satellite that cannot beat the hub on cost per line for its own volume is not a service improvement, it is a delivery promise being subsidized by head office.
Test before you lease
A lease is a five-year decision and a market test is a three-month one. Before committing to a building, run the demand from a third-party warehouse, or place a consignment trunk of the top two hundred part numbers at the two or three largest customers and measure how often it is drawn down. If the trunk stock sits untouched for a quarter, the demand was never there.
The test also shows what a satellite should hold. A trunk drawn down weekly on filters and hoses but never on final drives is telling you exactly where the line falls between what must be local and what can stay centralized. Guangzhou Shenyue Machinery Technology Co., Ltd. supports both models, because a distributor can buy depth on the core lines and cover the tail from the 100,000+ part numbers available to order rather than owning it.
Guangzhou Shenyue Machinery Technology Co., Ltd. runs four warehouses in Guangzhou, each over 1,000 m², holding 3,000+ part types on the shelf and 100,000+ part numbers available to order, which is what lets a distributor keep its satellites thin. We are formally authorized for five brands: Garrett, Mitsubishi Heavy Industries, TONGMYUNG, NIKURA and Marusan. For Kobelco and the other machine brands we are not an authorized dealer; those lines ship as genuine parts through original supply channels, or as OEM-quality and aftermarket equivalents.
What belongs at each level
| Level | Role in the network |
|---|---|
| Hub | Full range and depth on the core. Owns transfer and cross-ship decisions. |
| Satellite | Core fast movers only, sized to local demand. No tail, by rule. |
| Trunk stock at a customer | Top 100 to 200 numbers on consignment, reviewed quarterly. |
| Not stocked anywhere | Slow tail. Quoted with a lead time and sourced to order. |
Frequently asked
Is next-day delivery achievable from a single warehouse?
In a compact market, yes, if the building sits near the transport corridor and the cut-off is late enough. The limit is geography rather than the building: a van that needs six hours to reach the customer cannot promise next morning from one site, whatever is on the shelf.
Should satellite locations price differently?
Yes, if the cost per line differs. A satellite order that carries a transfer surcharge the hub does not have is either priced to reflect it or quietly losing money. Customers accept a delivery charge more readily than they accept a price that changes depending on which depot answered the phone.
How often should the network be reviewed?
Once a year against demand, and immediately after a large customer opens or closes a site. Networks drift because the machine population moves and the leases do not. A satellite opened for a mine that has since closed is a fixed cost with no revenue behind it.