What the rule actually does
United States law treats goods made wholly or partly in the Xinjiang region as inadmissible unless the importer rebuts a presumption that forced labor was involved. The shipment is held, and the burden of proof sits with the importer rather than with the agency.
There is no minimum value below which the rule stops applying. A sample carton of seals is examined on the same logic as a container of castings, so a small parcel does not escape because it is small. Importers who built their compliance around value thresholds learned that the hard way.
What the file has to contain
Published expectations are consistent: a supply chain map from finished part back to raw material, the name and address of every entity at every tier, production and shipping records that match the specific shipment, and evidence of how labor is recruited at each production site.
Blanket declarations fail. A stamped statement that a supplier does not use forced labor is treated as an assertion, not evidence. What carries weight is documentation produced in the ordinary course of business — purchase orders, mill certificates with heat numbers, payroll records, inland bills of lading — because those are difficult to construct after a detention.
Why castings and rubber are the hard lines
A machined housing looks like one item and is not. The casting comes from a foundry, the iron or steel from a mill, the pattern from a pattern shop, and each sits a tier or two behind the company that invoices the buyer. Tracing a heat number back to a mill is routine for a foundry and unfamiliar to a trader.
Rubber is awkward in a different way. Seals and hoses begin as compound, compound begins with base polymer and carbon black, and the compounding may be done by a third party buying from several sources. The tier that matters is often the one nobody in the chain has a direct commercial relationship with.
Building a pack that survives a hold
Start where exposure is highest and visibility lowest: castings, forgings, rubber, and anything with a steel content traceable to a single mill. For each family, write a one-page map, then attach the underlying records behind it. Guangzhou Shenyue Machinery Technology Co., Ltd. assembles that map per family rather than per shipment, because the chain does not change with every order.
Keep entity names consistent. Holds are often prolonged by a mismatch between the name on the invoice, the name on the mill certificate and the name in the narrative, and each mismatch costs a week of correspondence. Refresh the file annually, and again whenever a supplier changes foundry or compounder.
What the answer should be
Guangzhou Shenyue Machinery Technology Co., Ltd. is an independent supplier working from Guangzhou since 2007, with 3,000+ part types on the shelf and 100,000+ part numbers available to order through original supply channels. Visibility into the tiers behind a part depends on the cooperation of the producer, so we say which families we can trace and which we cannot.
We are authorized for four brands — Mitsubishi Heavy Industries, Garrett, TONGMYUNG and Marusan — and supply other machine brands as genuine parts through original channels or as OEM-quality and aftermarket equivalents. For Kobelco and other machine brands we are not an authorized dealer. A buyer who needs a trace file before an order should raise it at quotation stage, not after the container is booked.
Each tier, and the record a reviewer wants from it
| Tier | Record that satisfies a reviewer |
|---|---|
| Finished part supplier | Invoice, packing list and production records matching this shipment. |
| Component maker | Purchase orders and receiving records that name the next tier down. |
| Foundry or compounder | Mill certificates with heat numbers; compound batch records. |
| Raw material | Producer name, country of origin and shipment dates. |
| Labor | Recruitment channel, contracts and payroll evidence at each site. |
Frequently asked
Does this apply to goods that never enter the United States?
No, the presumption is a U.S. import rule. Buyers elsewhere increasingly ask similar questions under their own due diligence laws, so a trace file built for one market usually shortens the work for the next one.
Is a supplier audit enough?
Only if it reaches the tiers that matter. An audit of the trading company confirms an office. A reviewer wants the foundry, the mill and the labor recruiter, which means the file has to be built with the producer's cooperation rather than around it.
How long should a trace file take to assemble?
Weeks for a family that is already documented, months for one that is not. That asymmetry is the argument for starting with castings and rubber before a shipment is booked, rather than after it is held.
Send the machine model, serial number, the part numbers you have and the quantity. That is all we need to quote and confirm fitment before payment.
Request a quote