Get a Quote

Home / Blog / A D04EG stocking plan for workshops across 30-plus countries

A D04EG stocking plan for workshops across 30-plus countries

A workshop in one country and a distributor in another can serve the same Kobelco short-radius fleet and need completely different shelves. The difference is not taste. It is machine population, and a D04EG stocking plan starts by counting it.

Step one: count the machines, not the brands

The D04EG powers the Kobelco short-radius class, typically the SK135SR and SK140 series machines. A stocking plan begins with a count of how many of those machines operate within your reach — your own fleet, your contract customers, the contractors who call you when something stops.

That count, not a catalog, sets your stock depth. Ten machines in regular sight justify a working shelf of the fast movers. Thirty or more justify depth in sets and a reorder cycle. A machine you see once a year justifies nothing on the shelf and everything on a known lead time.

Step two: rank the fourteen lines by what the fleet consumes

Within the fourteen D04EG shelf lines, consumption is not democratic. The SCV VA32K6107500 and the injector 0445110610 lead, because fuel-system wear is the most common reason a running D04EG comes in. The turbocharger VA4933500701 follows as the volume assembly. The pump VA32K6500010 and the rail 0445224077 sit behind them, needed less often but stopped-machine urgent when they are.

The mechanical lines — the updated head gasket VA32K0102501, piston VA32K1700100, front oil seal VA32A1104010, pulley VA32B2011201 and water pump VA32K4500010 — follow the repair schedule of the fleet rather than its breakdown rate. The EGR cooler VA32K3201100 and the fuel temperature sensor VA32K6107900 turn with the emissions-side complaints. The ECU VA32K8701010 and the manifold nut VA32A3202300 close the list: one rare and expensive, one cheap and consumed.

Write your own ranking from your own invoices after the first quarter. The ranking above is a starting shape, not a substitute for your data.

Step three: set depth and a reorder trigger per line

Depth follows the ranking and the machine count together. A simple working rule: fast movers held through one full reorder cycle plus one repair, mid-speed lines held at one unit per ten machines in sight, slow lines held at zero with a supplier lead time you have actually tested.

The reorder trigger matters more than the opening depth, because an opening stock is a guess and a trigger is a system. When the last set of injectors leaves the shelf, the reorder goes out that day, not at the monthly review. A supplier who answers within a day and photographs before dispatch makes that discipline cheap to keep.

Review the triggers quarterly against what actually moved. A line that has not turned in two cycles gets its depth cut and the cash moves up the ranking.

Step four: choose a supplier on response, not on promises

For a workshop an ocean away from the source, the supplier's behavior is part of the stock plan. A quotation answered within 24 hours keeps a reorder cycle short. Photographs of the actual goods before dispatch remove the largest risk of buying unseen. A named grade on every line keeps your own resale honest.

Guangzhou Shenyue Machinery Technology Co., Ltd. has supplied excavator parts from Guangzhou since 2007 to buyers in more than 30 countries, working to exactly that pattern: quotations answered within 24 hours, real photographs of the actual lines before dispatch, and grade and condition stated per line. The stock structure is 3,000+ part types on the shelf and 100,000+ part numbers available to order.

Mitsubishi Heavy Industries is one of our four authorized brands, alongside Garrett, TONGMYUNG and Marusan, and the authorization covers Mitsubishi Heavy Industries engine parts, which is where the D04EG range sits. For Kobelco and other machine brands we are not an authorized dealer; machine-side lines are supplied as genuine through original channels or as OEM-quality and aftermarket equivalents.

Matching depth to fleet size

Machines in regular sightWorking stock shape
Up to 10Fast movers in singles, injectors in one set, slow lines on lead time.
10 to 30Fast movers through one reorder cycle plus one repair; injectors in two sets.
30 and aboveDistributor depth: sets on the fuel lines, multiples on gaskets and seals.
Machines seen rarelyNothing on the shelf; everything on a tested lead time.

The stocking plan in four steps

  • Count the SK135SR and SK140 class machines within reach
  • Rank the fourteen shelf lines by your own consumption
  • Set depth and a reorder trigger per line
  • Test the supplier on quote speed and pre-dispatch photos

Frequently asked

How fast are quotations answered?

Within 24 hours. At Guangzhou Shenyue Machinery Technology Co., Ltd. every quotation states the grade, the condition and the shelf status of each line separately, and shelf lines are photographed before dispatch so you can confirm the actual goods before they move.

We are a small workshop. Is a platform stock still worth building?

Yes, at the depth your machine count justifies. A small fleet earns a thin shelf of the fast movers and the repair-completion small parts, with everything else on a tested lead time. The plan scales with the count; the discipline stays the same.

Can the plan start with a trial order?

It should. A first order of mixed fast movers and small parts is the cheapest way to test quote speed, packing, documents and photographs before you commit depth. The result of that trial is the evidence the rest of the plan is built on.

Get a price on this line

Send the machine model, serial number, the part numbers you have and the quantity. That is all we need to quote and confirm fitment before payment.

Request a quote