Container condition and pre-loading checks for parts shipments

Most water damage claims on excavator parts consignments are not caused by storms at sea. They are caused by cargo stuffed into a container that was never fit to carry it, and nobody looked at the empty box before loading.

The container is part of your packaging

An ocean container is hired equipment. The carrier supplies it in a condition that is legal to ship, which is not the same as a condition that is fit for moisture-sensitive cargo. Holes patched with tape, door seals that have lost their compression, floorboards cracked from previous forklift work, and residue from the last cargo — chemicals, spices, minerals — are all common findings on containers presented for loading.

For machine parts the stakes are specific. A machined surface rusted by salt air entering through a door gap is a regrind or a reject. An electrical component that absorbed the smell and moisture of a previous chemical cargo is a warranty conversation with your customer that starts badly. The container decides both outcomes before the goods are even inside.

The ten-minute pre-loading inspection

A usable inspection takes about ten minutes and needs no tools: close the doors and look for daylight inside, walk the walls and roof checking for dents and repairs, examine the floor for cracks and soft spots, smell the interior, and read the safety approval plate. Desiccant is the last step, and it is a step, not a formality: enough of it, placed for the journey, is the cheapest insurance on the whole shipment.

Guangzhou Shenyue Machinery Technology Co., Ltd. runs this check on every container before stuffing, because the ten minutes is cheaper than one claim, and the findings go into the loading record with photographs. A documented clean container is also the best possible starting position if a claim does arise later in transit.

Whose job is it under the shipping terms

Under free-on-board terms the seller loads the container before it leaves their control, so the pre-loading inspection is naturally theirs to run. Under an ex-works arrangement the buyer's forwarder stuffs the container, and the buyer should specify the inspection in writing, because a forwarder on a schedule will otherwise treat the empty box as somebody else's problem.

Incoterms define where each party's responsibility begins and ends, and the container is handed over at exactly that boundary. Whichever side performs the loading, the rule that survives every dispute is the same: whoever stuffs the container owns its condition at that moment, and photographs at that moment are worth more than any argument afterward.

When the container is not fit

A container that fails the inspection is not a negotiation; it is a rejection. Ask the depot for a swap, note the refusal on the equipment interchange receipt, and photograph what was found. Every carrier maintains replacement stock, and a swap costs an hour. A claim filed after arrival, against a container that was visibly unfit before loading, costs months and often fails on the paperwork.

The record matters as much as the refusal. The EIR notation and the photographs together establish the container's condition at handover, which is the fact every marine survey starts from. Shippers who keep that file clean recover claims that shippers without it do not.

The standard we load against

Guangzhou Shenyue Machinery Technology Co., Ltd. has shipped excavator parts from Guangzhou since 2007, and the pre-loading check is part of the standard, not an upgrade. We are an independent supplier, formally authorized for five brands — Garrett, Mitsubishi Heavy Industries, TONGMYUNG, NIKURA and Marusan — and not an authorized dealer for Kobelco or other machine brands, which we state plainly; genuine lines for those brands are bought through original supply channels or quoted as OEM-quality and aftermarket equivalents.

With 3,000+ part types on the shelf and 100,000+ part numbers available to order, most of what we ship is consolidated into fewer, fuller containers — which makes the condition of each one matter more, not less.

The ten-minute container check

CheckWhat a failure looks like
Door seals and door frameFlat, cracked or missing seal rubber; daylight visible around closed doors.
Walls and roof from insideDents, patches, tape repairs, or daylight through holes in a dark container.
FloorCracked boards, soft spots, protruding nails, or stains that suggest leaking cargo.
Interior smell and residueChemical, mineral or food odors that will transfer to packaging and goods.
Safety approval plateMissing, illegible or expired plate: the container should not be accepted at all.
Desiccant placed and loggedNo desiccant, or strips hung against the walls where they cannot absorb anything.

Frequently asked

Who pays if cargo is damaged by a leaking container?

It depends on the terms and on the evidence. Under FOB terms the seller controlled the stuffing, so a documented pre-loading inspection supports a claim against the carrier; without that documentation the claim usually fails. The inspection record and the EIR notation are what turn a loss into a recovery.

How much desiccant does a parts container need?

It depends on the cargo, the season and the route, and a supplier who ships regularly will have a working standard for each. The common mistake is not the quantity but the placement: desiccant hung against the container wall does almost nothing. It belongs around the cargo, distributed through the load.

Can we require container inspection when we buy ex-works?

Yes, and it should be written into the purchase order and the forwarder's instructions. The inspection is a half-day task at most, and specifying who performs it, who photographs it, and where the record is kept removes the whole argument about who was responsible for the box.