Get a Quote

Home / Blog / The inland leg: trucking, cut-offs and export clearance in China

The inland leg: trucking, cut-offs and export clearance in China

Buyers plan the ocean voyage carefully and then discover the riskiest days of a shipment are the two before the container leaves the yard. The inland leg is where delays, surprise charges and reworked loads actually happen.

What happens between the warehouse and the vessel

Once an order is packed, a truck is booked against a vessel cut-off: the latest time the container can be delivered to the terminal and still make the ship. Heavy parts are loaded with the dense cargo low and central, the container is weighed for the verified gross mass declaration, and the truck moves to the port. In parallel, the export declaration is filed in China, matched against the commercial invoice, packing list and, where applicable, any license the goods require.

Each of those steps has a failure mode the buyer never sees: a truck canceled the night before, a weight over the road limit that forces a rework, a declaration description that does not match the packing list. None of them are exotic, and all of them are why a professional supplier builds a buffer of days between goods-ready and vessel cut-off instead of promising both on the same date. Guangzhou Shenyue Machinery Technology Co., Ltd. states the two dates separately on every shipment plan for precisely this reason.

Who pays for what on each term

Under ex-works, the buyer's forwarder collects from the supplier's warehouse, and every local step, trucking, terminal handling, the export declaration, bills to the buyer. Under free-on-board, the supplier delivers the container loaded on board and carries the domestic costs up to that point, which is why an FOB price is normally cleaner for an overseas buyer than an EXW price that looks lower. Delivered terms move the boundary further and price the destination leg in.

The trap is not the term itself but the local charges quoted around it. Terminal handling, documentation fees and the export declaration cost real money, and a buyer comparing an EXW quotation against an FOB quotation without listing those local items is comparing two different totals.

Where inland delays actually come from

Three causes dominate. Holiday periods in China compress trucking and customs capacity into the days before and after, which is why orders are scheduled away from the national holiday calendar rather than through it. Port congestion pushes cut-offs earlier without notice. And document mismatches, a part description on the invoice that the packing list does not support, hold a container at the terminal until the paperwork is corrected.

A buyer can manage all three by asking one question early: what is the goods-ready date, and what is the vessel cut-off, separately? A supplier who answers with two dates and a buffer between them has an inland process. A supplier who answers with one date is hoping.

What we commit to on the inland leg

Guangzhou Shenyue Machinery Technology Co., Ltd. schedules every shipment with a stated goods-ready date distinct from the vessel cut-off, builds the holiday calendar into quoted lead times, and issues a packing list that matches the invoice line by line so the export declaration files clean the first time.

We are an independent supplier, formally authorized for five brands — Garrett, Mitsubishi Heavy Industries, TONGMYUNG, NIKURA and Marusan — and for major machine brands, including Kobelco, we are not an authorized dealer; those lines are genuine through original supply channels or OEM-quality and aftermarket equivalents, stated on every quotation. 3,000+ part types on the shelf and 100,000+ part numbers available to order mean most shipments start from stock, and the inland leg starts from a warehouse floor, not from a sourcing promise.

Local charge items by trade term

TermWho normally carries the domestic cost
EXWBuyer: trucking, terminal handling, export declaration, all local fees.
FOBSeller through loading on board; buyer takes the ocean leg and beyond.
CFR / CIFSeller carries ocean freight (and insurance on CIF) to the named port.
DAP / deliveredSeller carries costs to the destination point; import duty stays with the buyer.

Frequently asked

Why is an FOB quote sometimes higher than an EXW quote for the same goods?

Because FOB includes the supplier's domestic trucking, terminal handling and export declaration, which an EXW quote leaves for the buyer's forwarder to charge separately. Add those local items to the EXW total before comparing; the gap is usually smaller than it looks.

How far before Chinese New Year should an order ship?

Plan for the goods to leave China several weeks before the factory close, not during it. Trucking, customs and carrier space all compress in the final days, and the recovery after the holiday takes longer than the holiday itself. We publish the holiday calendar into quoted lead times each year.

Can my own forwarder collect from your warehouse?

Yes, on ex-works terms we hand over packed goods with the invoice and packing list your forwarder needs. Most buyers with no China presence, though, find FOB simpler, because the inland leg then sits with the desk that controls the packing.

Get a price on this line

Send the machine model, serial number, the part numbers you have and the quantity. That is all we need to quote and confirm fitment before payment.

Request a quote